Top Products
ETAP
SEE
CANECO
Make sure your system is ready. Check the recommended specs for the best experience.
Unlimited Buses and DevicesNew
Load Flow
Short Circuit
Transformer Sizing
Transformer Tap Optimization
Panel Schedule
Cable Sizing
International Cable Standards
Network Project Management
AVEVA Engineering Data Exchange
Excel Data Exchange
Autodesk AutoCAD Data Exchange
Autodesk Revit Data Exchange
Protective Device Coordination
Protective Device Sequence of Operation
Automated Protection Device Evaluation
Motor Acceleration
Motor Parameter Estimation & Tuning
Harmonics
Interharmonics
Flicker Compliance Evaluation
Network Type
Subscription Duration
Number of Users
Additional Requirements
Real-Time Server
Advanced Monitoring
Dashboards
Alarm Management
Historian
Playback
Redundancy
Web-based HMI
Number of HMI Users
Number of HMI Screens
Tag Limit
State Estimation
Simulate Before Operate
What if Analysis
Playback Server
Situational Intelligence
Predictive Simulation
Motor Starting
Switching Sequence Management
Transient Stability
Unbalanced Load Flow
OTS Server
OTS Client
Playback Client
SCADA Operations
Switching & Maintenance Sequence
Power & Energy Management
Time Domain Load Flow
Auditing & Settings History
Substation Hierarchical Model
Download Relay Settings
Asset Lifecycle Management
Settings Tracking Dashboard & Notifications
Work Order Management
Additional Requirement
Grid Code Analysis
Time-Domain Load Flow
Quasi-Dynamic Load Flow
DC Load Flow
PQ Capability
Harmonic Analysis
Frequency Ride-Through
User-Defined Dynamic Models
Power Plant Controller
Electromagnetic Transients
EMTCoSim
Additional Features