A European glass manufacturer operates an existing 10 kV distribution system supplying about 20 MW. As part of an expansion project, new loads and transformers had to be added around substation SS4. With a combination of brownfield and greenfield equipment, Selecty’s mandate was to define protection settings for the new equipment and verify and adjust upstream protection to maintain proper coordination. They needed to mitigate arc-flash incident energy at critical locations to below 8 cal/cm², and provide a clear, documented protection recommendation that the customer could validate and approve.
Location: Trescore Balneario, Italy
Year: 2021
Design and sizing the protection system in relation to the plant expansion
Model the actual electrical system
Understand the existing protection strategy
Define new protection for the expansion
Arc-flash mitigation at 10 kV
Prove the solution to stakeholders
Which solutions did they choose?
1. Digital Twin & TCC Diagrams
Result: confirmation that the existing system was generally well protected and well coordinated, but with excessive arc-flash incident energy.
2. Motor starting & protection coordination
3. Transformer & feeder protection optimization
This gave quicker fault clearing in the critical zone while keeping coordination with upstream devices.
4. Arc-Flash analysis & C-area plot editor
Finding: with original settings, most clearing times were too long, leading to incident energy above the acceptable envelope.
5. STAR™ Auto-evaluation & Rule Book
The tool flagged under-utilised cables, potential mis-coordination, and allowed quick graphical corrections directly on the TCC or via relay parameters.
6. Intelligent Automatic Zone Detection
Why do they use ETAP?
Arc-flash level successfully mitigated
Coordinated brownfield and greenfield protection
Single multi-purpose analysis platform
Objective verification for the client
Future-ready Digital Twin
What do they think about ETAP?
So, what I really love about the ETAP is that we can combine modern calculations and properties together to quickly evaluate motor starting based on the actual conditions at the client’s facility.
ETAP Auto-Evaluation and the flexibility provided by the Rule Book helps us to validate various projects. It makes it very easy to compare the tripping characteristic, the withstand characteristic against the rules that have been defined.
Power Simulator
ETAP Digital Twin
Arc Flash Auto-Evaluation & Coordination
Grid Modeling & Visualization
Core Modules (Base Package)
Star - Protective Device Coordination
Motor Acceleration
Star - Short-Circuit Analysis
ArcSafetyâ„¢ - AC Arc Flash
Overcurrent Protection & Selectivity
Protection Zone & Path Detection