热门产物
快的 链接
ETAP StarZ 距离继电器保护配合软件为消除误动作,保护设备误操作和无配合提供深刻理解
距离继电器配合软件提供直观的逻辑性方法用于 R-X 参数特性分析,其中特性和功能包括易于操作的图形化用户界面,准确的保护设备建模,创建继电器和设备设置报告,以及内嵌式电力系统分析模块,所有这些都是集成式,基于规则的设计。
All the details of substation protection and control system (P&C) such as bus configuration, CTs and PTs, CBs, Switches can be graphically modeled. Not only this is for the sake of graphical representation, but also fault can be applied on any connector between power system primary components. This allows to catch blind spots and deep setting errors in the protection system. To reduce the wiring among relays and instrument transformers, ETAP allows protection relays to be connected remotely to CTs and PTs through a newly enhanced remote connector element.
探索附加组件和其他相关产物。
查看所有产物
阅读有关该产物突出显示的解决方案的信息。
查看所有解决方案
查找包含该产物作为其集合一部分的包装捆绑包。
查看所有套餐
了解该产物在各个行业的应用。
查看所有行业
了解该产物在工程系统中的用途。
查看所有系统
查看所有资源
ETAP Train Power Simulation - eTraX™ software includes validated, user-friendly and flexible software tools for designing, analyzing and managing AC and DC railway infrastructure. Learn how eTraX integrates with ETAP protection & coordination software (StarZ) to?offer insights into line protection, protective relay performance & evaluation, troubleshooting false trips, and system-wide protective device operation.
Many protection functions such as over/under frequency, out-of-step, generator loss of excitation are set based on power system dynamic characteristics. These protection functions were conventionally set with the assumption that, system dynamics are predictable using simplistic and aggregated models. Higher penetration of distributed energy resources (DERs) has made power system dynamics considerably more complex to predict through conventional approaches. ETAP offers a new solution to perform unified protection and transient stability study to accurately capture interactions between system dynamics and protection system. This solution allows protection engineers and network planners to 1- tune protection settings to act properly during system dynamics, 2- design and test remedial protection schemes, 3- evaluate all protection functions such as out-of-step, overcurrent and generator loss of excitation protection function and 4- perform grid code studies that require evaluating DER performance along with its protection system.
Per North American Electric Reliability Corporation (NERC), 28% of protective relay mis-operations are due to incorrect settings and logics. These errors mainly stem from the existing relay testing procedures that do not provide a proper mechanism to easily and effectively evaluate the performance of all settings, logics, and the protection system as a whole. ETAP StarZ™ is a new solution to minimize protective relay setting errors and reduce the time required to perform protection and coordination studies.
通过申请适合您的培训课程来深入了解我们的电气工程软件。
立即探索
免费试用 ETAP 30 天,亲自体验 ETAP 解决方案的功能 。在此基于云的演示平台上随时随地试用 ETAP 丰富的模块集合和分析结果 。立即开始您的在线演示!