????
40??? ????? ??? ?? AI, ???? ?? ??, ETAP ??? ?? ???? ????? ???? ?? ???????.
?? ?? ??? ??
50+
? ?? ? ?? ??
23,000+
????? ??
17,500+
?? ?? ??
5,000+
PV ??? ??
900+
?? ??? ? ??
30+
??? ?? ??
2026? ??? ??
????? ???? ???? ?? ??? ?? ETAP ??? ??? ? ??? ?? ??? ?????¡£
???? ??????.?? ??? ?? ?????.
AI ?? ???, ?? ? ????.
???? ?? ???? ?????? ??? ?????.
??? ?????.??? ?????.
?? ??? ??? ?? ? ?? ????.
?? ???? ???????? ???.
????? ????????????.
???? ?????.???? ?????.
???? ??? ???? ?????.
?? ??
??? ??
ETAP 2026? 3D ???? ???? ??? Network Manager? ???? ????? ?? ???? ?????? ??? ?????. ??? ??????? ??? ??? ?? ???? ????? ????? ? ??? ???? ????? ????.
??? ? ????? ??? ?????? ??? ??? ?????
???? ??? ???? ??? ??? ????? ???? ??? ? ??? ?????
????? ?? ?????
?? ??? ??? ??? ??? ?????. ?? ?????? ?? ??? ?? ??? ?? ? ?? ???? ?? ??? ???????¡£
?? ?? ????? ??20-30%? ??? ??? ?? ??, ???, ?? ? ??? ???? ??? ????.
AI ? ?????
ETAP 2026? Electric AI Copilot? Autocomplete? ????? ???? ???? ???? ?? ???? ???? ???? ???? ???? ???? ???? PDF? ???? ????? ??? ??? ????? ?????.
??? ??? ???? ???? ???? ??, ??, ?? ? ?????.
?? ????? ???? ????? ??? ??? ?? ?????.
????? ???? ???? ????? ETAP ?? ??? ?? ???? ??? ??? ? ?? AI ??? ?????.
???? ? ??? ??
ETAP 2026? ????? ???? License Manager? 30? ??? ??? ?? ?? ??? ???? ??? ??? ??? ?????? ???? ?????.
????? ???? ?? ?? ?????.
?? ???? ???? ???? ?? ?? ???????.
ISO 27001 ?? ??? ?? ?? ????.
??? ??? ?? ???? ?? ?? ??? ???? ?? ?? ???? ??? ???? ????? ?? ?????.
???? ?? ??? ???? ????? ?? ??? PPE ??? ?? ?? ? ?? ???? ???? ? ????.
?? ? ??
ETAP 2026? NFPA 70E 2027, CSA Z462 2024 ? EN 50110-1 2024? ??? ?? ??? ??? ???? ???? ??????. ?? ?? DC ?? ??? ???? ???? ?? ???? ?? ?? ???? ?????.
??? ?? ? BESS? ?? ??? ?????.
?? ?? ????? ? ?? ?? ??? ?????.
?? ??? ???? ?????.
??? NFPA 70E 2027 ?? ??? ?????
ETAP 2026? ??? ?? ???? ???? ?? ??? ? ??? ????? ?????. ???, ???, ?? ? ?? ??? ???? ???? ???? ??? ??? ??? ??? ? ?? ????? ??? ?????? ?? ??? ?????.
Fault Isolation verification in meshed networks and succeed/fail notifications
Clear coordination analysis with original and shifted TCC curve plots, applying breaker delays, fuse preloading, and time/current shift factors
PD settings deliverables with Excel-ready reports and datablocks
Multi-stage short circuit and protection & coordination evaluation
??? ??? PV ?? ?????? ????? ?? ???? ???? ???? ?? ???? ??? ??? ??? ? ??? ??? ? ????.
????? ???? ?? ?? ??? ??? ??????? ?? ??? ?? ??? ??? ??? ??? ? ????.
??? ? ?? ??
ETAP 2026? ??? ?? ???? ?? ?????? ???? ?? ??? ??? ??? ?? ?? ??, ??? ?? ? ??? ???? ???? ??????.
Estimates and analyzes of motor parameters from manufacturer data.?
?? ?? ?????? ???? ?? ??? ?? ? ??? ?????.
BESS ? ????? ???? ?? ???? ??? ?????.
????? ? ?? ?? ??
ETAP 2026? ????? ??? ?? ??? ???? ??? ?? ??? ?????. ??? ?? ??? ?? ?? ?? ????? ??? ???? DER ??? ?????? ?? ???? ?????.
?? ? ???? ???? ????? ??? ?????.
Optimizes Volt-VAR with CO2 intelligence.?
??? ????? ???? ?????.
Studies thermal limits across entire transmission path (IEEE 738/605/C57.91 & FERC Order 881).?
Identify the true capacity by evaluating voltage rise, harmonic THD, and breaker ratings simultaneously to determine exactly what upgrades unlock more MW.
In industrial facilities, teams prioritize critical assets first, reducing downtime and compliance risks through system-driven maintenance insights.
?? ?? ? ????
ETAP 2026 integrates maintenance directly into the digital twin, enabling risk-based, system-aware asset management with real-time visibility into compliance and operational impact.
Records and tracks maintenance intervals to comply with NFPA 70B.?
Provides local and mobile access to asset information.?
Visualize, simulate, and manage electrical systems remotely from any device. Integrates monitoring, reporting, and scenario analysis.?
??? ?? ? ?????
With DataX™, ETAP 2026 enables seamless integration across GIS, BIM, CAD, and legacy tools - automating model creation and eliminating weeks of manual data re-entry.?
Scripts and studies automation enhancements to create a single-line diagram from Restful API.?
Supports SKM V11, Revit 2025 & 2026, AutoCAD 2025 & 2026, CIM17-GIS, ESRI ArcMaps 10.8.2, CanecoBT and ERACS.?
Adds 22 new elements, universal mapping, one-line view import/export.?
Engineers migrating from legacy tools can convert full systems instantly, including diagrams and device mappings.
Automatically identify fault locations and execute optimized switching sequences to restore power to hospitals and essential services first, reducing outage times from hours to seconds.
??? ? ??
The final frontier of the electrical digital twin is Operations. ETAP 2026 connects your physics-based, AI-powered model to the running power system. Automate decisions, response to disturbances in seconds, and prioritize critical loads with distribution management built for the modern grid. ?
Scales grid and power plant monitoring. Shows energized and de-energized feeders in real time.?
Prioritizes critical loads and generates optimal switching sequences.?
Provides real-time visibility into high-risk environments.?
A dual-module guide defining the visual narrative and feature categorization for a software-centric product launch.
Pair authentic infrastructure imagery with subtle interface overlays andrestrained geometric patterning. Use ETAP red as the dominant accent,while secondary colors highlight AI, compliance, cloud, and data momentsonly where needed. Content to be provided.
Use a compact, scrollable feature rail to help power users scan new modules and enhancements quickly without overwhelming first-time visitors.
Engineer safety before risk becomes reality.
Advance arc flash, transient DC analysis, capacitor energy discharge, and protection-coordination to protect people and equipment with engineering-grade precision.
Model the real system and predict how it behaves.
Validate performance across dynamics, transient stability, frequency response, motor starting, renewable integration, and real-time operations.
Accelerate every engineering workflow.
AI Copilot, Network Manager, 3D visualization, automation APIs, DataX interoperability, and expanded libraries reduce manual effort and speed decisions.
Enable cleaner power with confidence.
Support higher renewable penetration through feeder hosting capacity, Volt-VAR optimization CO?, BESS and DER analysis, grid-code dynamics, and time-series load flow.
Stay aligned with the latest standards and requirements.
Built-in support for current safety, maintenance, grid-code, and cybersecurity standards helps teams design and operate with confidence.
Discover how ETAP 2026 can transform engineering workflows, improve system reliability, and accelerate your energy transition with a more intelligent, connected, and secure platform.
Learn how the Electric AI Copilot? in ETAP 2026 are reshaping the engineer's role from data processor to strategic decision-maker. Highlighting this significant step forward in engineering productivity and accuracy, this presentation walks through th...
Située à l¡¯est de Los Angeles, en Californie, la ville d¡¯Azusa dessert environ 17 000 clients en électricité. Son service public d¡¯électricité intégré s¡¯engage à fournir un service sûr, fiable et performant à l¡¯ensemble de ses usagers, qu¡¯il s¡¯agisse...
Solar Bull, entreprise espagnole de référence dans le secteur des énergies renouvelables, partage son retour d¡¯expérience sur l¡¯utilisation d¡¯ETAP comme plateforme intégrée de modélisation et de simulation électrique pour ses projets solaires de gran...
Learn how ETAP Feeder Hosting Capacity (FHC) provides immediate insights on the optimal amount and placement of distributed energy resources (DERs). Enhanced in ETAP 2026, short circuit and harmonic constraints have been added to this module. The pre...
In this testimonial, KBB shares how they improved their processes through the use of SEE 3D technology to design and engineer switchboards and control cabinets. Now that they are using SEE Electrical and SEE 3D Panel Manufacturing, they can quickly t...