User-friendly interface for modeling unlimited Train Consists using the Rolling Stock Library and allows for flexible assignment of Train Consist per Trip in the Train Timetable.

Train Configuration & Assignment

  • Define and model train consist and order of rolling stock
  • User-definable train consist including locomotives, passenger, freight or mixed arrangements
  • Quickly assign train schedules to train configurations
  • Integrates with train rolling stock library
  • User-defined acceleration and braking limits

Train Schedule Key Features

  • Define unlimited train schedules per route
  • Define different train schedules for weekdays, weekends and holidays
  • Auto create train schedule for a given number of trains per day
  • Import train schedule from MS Excel format for faster data entry
  • Define train arrival times, dwell time or departure times
  • Easily utilize train schedules from 3rd party programs for electrical calculations

Videos

Literature

White Papers

培训与活动

ETAP Training

培训与活动

通过申请适合您的培训课程来深入了解我们的电气工程软件。

立即探索

Explore ETAP Today

立即探索 ETAP

免费试用 ETAP 30 天,亲自体验 ETAP 解决方案的功能
。在此基于云的演示平台上随时随地试用 ETAP 丰富的模块集合和分析结果
。立即开始您的在线演示!