欧美A片

Grid Code Harmonic Compliance Assessment

Grid Code Harmonic Compliance Assessment

Grid Code Harmonic Compliance Assessment

Key Features

Videos

It is crucial to define the reactive power limits to evaluate the voltage support available under normal, abnormal and emergency operations with the unit's safe functioning. Published generator thermal capabilities curves, produced by the manufacturer, define the limits for safe operation based on the generator design's thermal limitations. Practically, the available reactive capability differs from the published equipment curves due to plant specific design and operating constraints. This presentation discusses a theoretical approach utilizing a simplified electrical distribution system and an ETAP model to identify and validate the plant-specific unit capability. 

Literature

White Papers

?? ? ???

ETAP Training

?? ? ???

???? ?? ?? ??? ???? ?? ????? ?????? ?? ???? ???? ????.

?? ?????

Explore ETAP Today

?? ETAP? ??????.

30? ?? ??? ETAP ??? ????? ??
ETAP ???? ??? ?? ??????. ?? ????
? ???? ?? ?? ????? ETAP? ???? ?? ???? ?? ??? ??? ?? ? ????. ?? ??? ??? ?????!