Top Produkte
Quick Links
Nuclear plants in the United States are governed by federal regulations requiring that the electrical power system provide sufficient capacity and capability to the nuclear plant. As part of this analysis, traditional approaches to manually perform single motor start calculations can be tedious and time-consuming. Also, the manual evaluation of the data can easily introduce errors. This presentation takes a closer look at degraded voltage relays (DVRS) and an approach to simulation used by the TVA that is holistic, using ETAP to easily combine the study cases, the revisions, and the configurations into repeatable studies. The demonstration includes the use of an efficient solution using Python code with ETAP to run the studies and evaluate the resultant data.
Erhalten Sie einen vertieften Einblick in unsere Elektrotechnik-Software und fordern Sie eine für Sie passende Schulung an.
Jetzt entdecken
Testen Sie ETAP 30 Tage lang kostenlos und überzeugen Sie sich selbst von den Leistungsf?higkeit der ETAP-L?sungen.? Testen Sie ETAPs umfangreiche Sammlung an Modulen und Analyseergebnissen auf dieser Cloud-basierten Demo-Plattform – jederzeit und überall. Starten Sie noch heute Ihre Online-Demo!